Get Price or Support

prestressing grout bonded anchors for anchoring pc strand cable

portable grout pump

Bonded PC Strand – pt-concrete.com

Bonded PC Strand is mainly used for the reinforcement of prestressed concrete structures, such as large-span railway and road bridges, crane beams,anchorages and multi-storey industrial buildings etc. We offer PC Strand which confirm to the technical standards such as GB/T 5223, GB/T 5224, ASTM A-416, BS 5896, JIS G3536 or the standards agreed by both of the customers and us

concrete grout pump

Prestressed Concrete – Post Tensioning System

Stress Anchors (also commonly known as Live Anchors) is the most widely used form of anchors in prestressed concrete works. It consists of Anchor, Casting, Wedge and Bursting Reinforcement. It is most commonly found in bonded post tensioning using PC strand as tendons in prestressed concrete structure and rock/soil anchoring structure.

injection grout pump

Prestressing Multistrands Anchor – pt-concrete.com

YJM series of anchor system is work with 5mm to 10mm pc steel wire and 12.7mm, 15.24mm pc strand cable. The detail specifications see as followings: 1). YJM5 applies to 5mm, 5.2mm smooth surfase and spiral ribbed pc steel wire. 2). YJM6 applies to 6mm smooth surfase and spiral ribbed pc steel wire. 3).

grout station

China Grout Bonded Strand Anchors for Bridge Construction

Prestressed Anchor, Post Tension Anchor, Prestressed Anchorage manufacturer / supplier in China, offering Grout Bonded Strand Anchors for Bridge Construction, Cnm Full Hydraulic Crawler Anchoring Drilling Rig, Cnm 150 to 200m Hydraulic Crawler Drilling Rig and so on.

China grouting station

prestressed concrete slab anchor system

.com offers 122 prestressed concrete slab anchor system products. About 24% of these are metal building materials, 5% are anchors. A wide variety of prestressed concrete slab anchor system options are available to you, such as concrete anchor, wedge anchor.

concrete grout pump

DYWIDAG Strand Anchors – DSI EMEA

Bonded length: The anchor is fixed in the borehole using grout (cement mortar) and can transfer the forces to the loadbearing soil via bond and skin friction ; Unbonded length: Each strand is uncoupled from the borehole using individual ducts so that it can freely extend in the unbonded length. This way, tension can be applied to the anchor system